PROJECTS

OUR RECENT PROJECTS

in Construction Consultancy and Construction Design

Site management at the objective "Terminal extension Departures and Arrivals at Craiova International Airport"
Beneficiary: Dolj County Council

Eng. David Cristina
Site manager – Instalations for constructions

Eng. Radulici Emil
Site manager – Electrical networks

Eng. Ec. David Bogdan
Quality Control
Quantity Engineer
Team coordinator

Eng. Trusculete Marius
Site manager – Electrical instalations

Design of the drainage system for the project „Construction of the nursery in Codlea”

Eng. David Cristina
Design team coordinator.

Eng. David Adrian
Drainage design

Eng. David Adrian Cristian
Geotehnician

Eng. Pupaza Cristian
Topographist

Eng. Ec. David Bogdan
Economic documentation

Colaborators:
Eng. Mantulescu Marius
Geotehnician and laboratory studies

Site management at the objective "Dr. Fogolyan Kristof" County Hospital Sfantu Gheorghe

Lot 1 „Capital repairs and modernization of the Hospital building (old building), in order to adapt it to the norms and regulations in force, as well as the design of an extension to this building to provide day hospitalization and rehabilitation services”
Lot 2 „Polyclinic body extension for neurology offices, Stroke center and magnetic resonance imaging (MRI)
Beneficiary of the County Hospital
„Dr. Fogolyan Kristof „Sfantu Gheorghe

Eng. David Cristina
Site manager – Constructions and instalations for constructions

Eng. Chifane Relu
Site manager – Electrical networks

Eng. Ec. David Bogdan
Team leader
Quantity Engineer
Quality asurance Engineer

8
9

Site management at the objective "Energy efficiency of public buildings in Brasov - Transilvania Technical College, Building A
" Beneficiary: Brasov City

Eng. David Cristina
Site manager – Constructions and instalations for constructions

Eng. Radulici Emil
Site manager – Electrical networks

Eng. Ec. David Bogdan
Team leader
Quantity Engineer
Quality asurance Engineer

Site management at the objective Integrated project regarding the construction of collective social housing and street modernization in Ramnicu Sarat City, Buzau County
Beneficiary: Ramnicu Sarat City

Eng. David Cristina
Site manager – Constructions and instalations for constructions

Eng. Radulici Emil
Site manager – Electrical networks

Eng. Ec. David Bogdan
Team leader
Quantity Engineer
Quality asurance Engineer

Eng. David Cristina
Site manager – Roads, bridges, tunnels, airstrips, cable transport

Eng. Ghinet Cristian
Site managers – Roads, bridges, tunnels, airstrips, cable transport

Eng. Ec. David Bogdan
Team leader
Quantity Engineer
Quality asurance Engineer

Site management at the objectives reabilitation of 8 bridges on DN1 and DN13

Bridge repair works DN 1 km 138+850
Bridge repair works DN 13 km 9+732
Bridge repair works DN 13 km 19+070
Bridge repair works  DN 13 km 77+274
Bridge repair works DN 1 km 303+615
Bridge repair works DN 1 km 338+870
Bridge repair works DN 1 km 339+814
Bridge repair works DN 13A km 114+098
Beneficiary: NATIONAL COMPANY FOR ROAD INFRASTRUCTURE ADMINISTRATION S.A. through DRDP BRASOV